Guideline 7. Infrastructure and consumables

Submitted by Anonymous (not verified) on

To support its targeted prevention programme, the institution has a functional infrastructure and financial resources for consumables.

Relevant consumables include office equipment, transport for field staff, laboratory equipment and other, related expenses.

Guideline code
PREV_01000
Mechanism
Mechanism
  • The management should take the following elements into consideration for the introduction and implementation of effective prevention services:
    • The budget for non-personnel costs should include the costs of the prevention infrastructure, statistical planning for prevention projects, implementation of specific prevention projects and consumables;
    • The requirement for office equipment (e.g. furniture, computer, copier) and communications equipment (e.g. phones, mobiles, internet access, postal costs);
    • The need to ensure the mobility of field staff (e.g. provision of cars, fuel, vehicle maintenance, flight and other transport tickets) and personal protective equipment (PPE) for field staff;
    • The requirement for measurement and laboratory equipment.
Structure
Structure
  • The board should consider and decide on the prevention infrastructure in the context of available financial resources.
  • The management should prepare a detailed budget for the required non-personnel expenditure, to cover the prevention infrastructure, consumables and prevention projects.
Title HTML
Guideline 7. Infrastructure and consumables
Type
Guideline_1
Weight
14